Two stations are set to be constructed – “Mostytska” and “Prospekt Pravdy”
The company Autostrada has begun the construction of the metro in Vynogradar.
This was reported by the company’s press service on Friday, November 8.
“We are continuing the Syretsko-Pecherska (“green”) line – from the station “Syrets”. In total, the construction of two stations is planned – “Mostytska” and “Prospekt Pravdy”. The section from the station “Syrets” to the station “Mostytska” will be constructed using a closed method – through tunnel boring. From “Mostytska” to “Prospekt Pravdy” – using an open method. The total length of the construction (from the station “Syrets” to the station “Prospekt Pravdy”) is 3.78 km,” the message states.
On the concreted sections of the route from “Mostytska” to “Prospekt Pravdy”, which were left by the previous contractor, it is planned to install a repairable waterproofing system made of PVC membrane. As noted by the company, this type of waterproofing was used during the construction of the tunnel between the stations “Lybidska” and “Demiivska”.